company-top-image
Together We Make Everlasting Energy
VISION
Our vision is to lead Greece's shift towards renewable energy, moving away from traditional sources for a greener future.
We are committed to environmental protection and invigorating local economies with our projects.
TOGETHER, WE AIM TO FORGE A MORE SUSTAINABLE WORLD
corporate-social-responsibility
MISSION
We produce renewable energy, with respect for the environment and local communities. Our 25 years of experience, cutting-edge technologies and breadth of completed projects position us at the forefront of green energy players. We undertake the licensing, construction, operation and maintenance of renewable energy projects to produce clean energy while protecting the natural landscape and supporting the welfare of local communities.
company-our-values-image
OUR VALUES
Our values make us who we are as a team. At Nanko we believe in working hard, serving the local community and investing in each other every day.
We are dedicated to environmental restoration of impacted ecosystems, after the construction of our green energy projects.
We are constantly looking for new technologies and methods to minimize our
environmental footprint, ensuring our energy production is both efficient and
future-proof.
Our projects are designed to deliver economic benefits to the local
community, create job opportunities and foster collaborative relationships.
We operate with transparency and honesty in every customer interaction.
We nurture professional development and innovation, valuing initiative and
creative problem-solving.
We enforce rigorous safety protocols to ensure a secure working environment
for our personnel, underscoring our commitment to their well-being and
project integrity.
History
NANKO ENERGY S.A. was founded in 1999, as DIEKAT ENERGIA S.A. (Diekat Energy) a subsidiary of DIEKAT S.A. (Diekat).
In 2006 the company underwent significant transformation, changing its shareholder structure and rebranding to NANKO ENERGY S.A (Nanko).
Today, Nanko stands as a dynamic force in Greece's renewable energy sector, continually expanding its portfolio and operations.

1999

Construction of Lampeia SHPP in Ilia, the third private Small Hydroelectric Power Plant (SHPP) in Greece, boasting 1.3 MW

Diekat Energy collaborates with PPC RENEWABLES S.A. (PPCR) for the licensing, construction and operation of Small Hydroelectric Power Plants

2003

Commencement of construction of Katarraktis SHPP in Arta

2004

Commencement of construction of Agoriani SHPP in Fokida

2005

Katarraktis SHPP becomes operational, with a rated power of 2.4 MW

Diekat Energy and PPCR license and manufacture Gitani SHPP in Thesprotia, through the subsidiary GITANI S.A.

2006

Agoriani SHPP and Gitani SHPP commence their operations, with rated power of 1.9 MW and 4.2 MW respectively

Diekat Energy is acquired and renamed NANKO ENERGY S.A

Beginning of construction of Asprogeia SHPP in Florina and Mousda SHPP in Drama

2007

The company begins construction of Kriopigi SHPP in Arta

2008

Submission of request for a production license for Manikia SHPP in Evia with a rated power of 1.33MW

2009

Mousda SHPP and Kriopigi SHPP commence operations, with a rated power of 1.25 MW and 250 KW respectively

2010

Asprogeia SHPP becomes operational, with a rated power of 1.36 MW

Nanko receives production permits for 3 new SHPPs from RAE:

  • Giannitsi SHPP in Arta, with a rated power of 1.35 MW
  • Sminthis SHPP in Xanthi, with a rated power of 1.28 MW
  • Desi SHPP in Trikala, with a rated power of 1.57 MW

2011-2014

Focus shifts towards Operation and Maintenance services and licensing of owned projects

2014

NANKO receives a production permit for 4 Wind Parks.

  • Aetos 1 Wind Park in Florina, with a rated power of 24MW
  • Aetos 2 Wind Park in Florina, with a rated power of 24MW
  • Rogkakos Wind Park in Drama, with a rated power of 12MW
  • Trapezi - Kerasies Wind Park in Drama, with a rated power of 24MW

2018

NANKO receives a production permit for Pefkodasos Wind Park in Kilkis, with a rated power of 10 MW and Lavaro Wind Park in Florina, with a rated power of 18 MW.

2021

Nanko receives production permits for 3 SHPPs:

  • Nissis in Etoloakarnania, with a rated power of 1.3 MW
  • Theisoa in Arkadia, with a rated power of 5.00 MW and
  • Meristis in Fthiotida, with a rated power of 2.78 MW

The production license for Manikia SHPP, with rated power of 1.33 MW is issued by the Regulatory Authority for Energy (RAE)

2022

Nanko and TEAS S.A. form NATEGIA S.A., a joint venture for the construction of Giannitsi SHPP in Arta

2023

Nanko forms a joint venture with Messaritis Holdings S.M.S.A. creating the companies MENA PLATANOUSSA PLC and MENA KYPSELI PLC, for the licensing and construction of two projects:

  • Platanoussa SHPP in Ioannina, with a rated power of 0.68 MW
  • Kypseli SHPP in Arta, with a rated power of 1.18 MW

Giannitsi SHPP becomes operational, with a rated power of 1.35 MW

  1. 1999

    Construction of Lampeia SHPP in Ilia, the third private Small Hydroelectric Power Plant (SHPP) in Greece, boasting 1.3 MW

    Diekat Energy collaborates with PPC RENEWABLES S.A. (PPCR) for the licensing, construction and operation of Small Hydroelectric Power Plants

  2. 2003

    Commencement of construction of Katarraktis SHPP in Arta

  3. 2004

    Commencement of construction of Agoriani SHPP in Fokida

  4. 2005

    Katarraktis SHPP becomes operational, with a rated power of 2.4 MW

    Diekat Energy and PPCR license and manufacture Gitani SHPP in Thesprotia, through the subsidiary GITANI S.A.

  5. 2006

    Agoriani SHPP and Gitani SHPP commence their operations, with rated power of 1.9 MW and 4.2 MW respectively

    Diekat Energy is acquired and renamed NANKO ENERGY S.A

    Beginning of construction of Asprogeia SHPP in Florina and Mousda SHPP in Drama

  6. 2007

    The company begins construction of Kriopigi SHPP in Arta

  7. 2008

    Submission of request for a production license for Manikia SHPP in Evia with a rated power of 1.33MW

  8. 2009

    Mousda SHPP and Kriopigi SHPP commence operations, with a rated power of 1.25 MW and 250 KW respectively

  9. 2010

    Asprogeia SHPP becomes operational, with a rated power of 1.36 MW

    • Giannitsi SHPP in Arta, with a rated power of 1.35 MW
    • Sminthis SHPP in Xanthi, with a rated power of 1.28 MW
    • Desi SHPP in Trikala, with a rated power of 1.57 MW
  10. 2011-2014

    Focus shifts towards Operation and Maintenance services and licensing of owned projects

  11. 2014

    NANKO receives a production permit for 4 Wind Parks.

    • Aetos 1 Wind Park in Florina, with a rated power of 24MW
    • Aetos 2 Wind Park in Florina, with a rated power of 24MW
    • Rogkakos Wind Park in Drama, with a rated power of 12MW
    • Trapezi - Kerasies Wind Park in Drama, with a rated power of 24MW
  12. 2018

    NANKO receives a production permit for Pefkodasos Wind Park in Kilkis, with a rated power of 10 MW and Lavaro Wind Park in Florina, with a rated power of 18 MW.

  13. 2021

    Nanko receives production permits for 3 SHPPs:

    • Nissis in Etoloakarnania, with a rated power of 1.3 MW
    • Theisoa in Arkadia, with a rated power of 5.00 MW and
    • Meristis in Fthiotida, with a rated power of 2.78 MW

    The production license for Manikia SHPP, with rated power of 1.33 MW is issued by the Regulatory Authority for Energy (RAE)

  14. 2022

    Nanko and TEAS S.A. form NATEGIA S.A., a joint venture for the construction of Giannitsi SHPP in Arta

  15. 2023

    Nanko forms a joint venture with Messaritis Holdings S.M.S.A. creating the companies MENA PLATANOUSSA PLC and MENA KYPSELI PLC, for the licensing and construction of two projects:

    • Platanoussa SHPP in Ioannina, with a rated power of 0.68 MW
    • Kypseli SHPP in Arta, with a rated power of 1.18 MW

    Giannitsi SHPP becomes operational, with a rated power of 1.35 MW

corporate-social-responsibility
Our Services
We offer a wide range of services supporting all major types of renewable energy projects.
Our services can be tailored to client needs, offered either as a comprehensive package or as standalone offerings.
Small Hydroelectric Power Plants
We undertake the development of Small Hydroelectric Power Plants (SHPP), which contribute to local development in an environmentally friendly way.
Wind Parks
We offer Integrated licensing, installation and operation services of Wind Parks, thereby utilising one of the fastest growing Renewable Energy Sources worldwide
Photovoltaic Parks
Design, licensing, construction and operation of Photovoltaic Parks (PP), with the signature of our company.
Battery Energy Storage Systems
We carry out all stages of the development of Battery Energy Storage Systems (BESS), from feasibilit assessment, to grid connectivity and everything in between.
Operation & Maintenance
We offer Operation and Maintenance services of RES projects, ensuring that energy production is optimal and your sites have a long lasting lifecycle.